CONTROL BOX WIRING DIAGRAM
If you have an underwater bath light fitted to your bath you will need
to use the wiring diagram on the left.

Before making the connections on the left the whirlpool should be
tested with temporary connections between the ELCB and the pump.

The air tube should be connected directly to the pump for
testing purposes.

Following the test do not switch the pump off using the control on
the bath, instead use the test button on the ELCB. Then remove all connections from the pump and connect as the diagram on the left.

Following the instructions above will leave the pump air switch in the on position which is required to allow correct operation when using the control box, and also test the ELCB, which is required at least on a monthly basis.
Note. All electrical connections must be carried out by a qualified electrician in conjuction with current regulations.
  Back

Link to Swinton IT Website